🥚 EGGonomics · UC Davis

Transmission by voltage class

SNAPSHOT 2026-09-28 all maps
Transmission by voltage class — loading…4,325 HIFLD segments in the Virginia envelope; 2,822 (65%) are flagged INFERRED='Y' -- path inferred, not surveyed.Beyond the filed paper — grid infrastructure, not an affordability claim.